Dams

There are many dams in the Quinte watershed. Quinte Conservation owns and operates 40 dams and there are many other privately owned dams. An interactive map of Ontario dams is available through the Ontario Ministry of Natural Resources and Forestry.

Each dam owned by us provides one or more benefits. Examples include: flood management, raising low water levels, recreation, water supply, habitat creation, historic, and hydro power production. The dams were built decades ago. They need ongoing repairs to stay in good working order.

We follow operating plans for each dam. The plans tell us when to operate based on time of year or water level. The plans also tell us how to operate. These plans consider all water users and the health of the lakes and rivers.

Many of our dams are only operated in the spring and fall. In the fall, water levels are lowered above the dam to reduce winter ice damage and spring flooding. After the snow has melted in the spring, we operate the dams to maintain higher summer water levels on lakes and to raise low river levels during droughts.

Our dams can be controlled by stop logs and panels, valves, or inflatable weirs. Some dams cannot be operated. These dams are referred to as weirs.

Weirs and dams that are only operated in the spring and fall are referred to as “run of the river” dams. This means that the dams do not change the flow in the river. All of the water that flows to the dam, flows over the dam, and continues downstream.

Water levels are affected by many factors, such as rainfall and snowmelt, dam operations, ice jams, beaver activity, and evaporation. Rainfall and snowmelt often increase water levels on lakes and rivers. Dam operations can raise and lower water levels above and below the dam. Ice jams can cause a rise in water levels directly behind the ice jam. Beaver dams can cause a rise in water levels above the dam and lower water levels downstream.

Our dams affect water levels immediately upstream, this is called the headpond. Water travels downstream because of gravity. If you are interested in knowing how big the headpond of a dam is, travel upstream until you see water flowing downhill (this can look like a section of rapids or water flowing over another dam). The dam does not back water up over the rapids or the dam.

Some of our dams can assist in flood management by collecting and holding excess water in the dam headpond. This reduces the water flowing through the river channel during the flood. A headpond can only hold a certain amount of water before it floods upstream, or high water levels washout the dam. Extreme rainfalls and snowmelts may contain too much water for our dams to stop flooding. The headpond can only collect water that drains to it. A flood caused by local rainfall downstream cannot be protected by the dam. We strive to provide flood management with our dams, but we are limited by the size of the headpond, and the location of rainfall or snowmelt.

During droughts we operate some dams to increase water levels in the river. The amount of water in the headpond determines how much water is available to assist the river. The shape of the dam outlet and the operation determines how long river levels will be improved.

As a result of historic ice jam floods, dams were built to reduce the risk of ice jams. These dams do three things:

  1. The dams create a stable water level in steep areas that would otherwise have turbulent rapids. The calm water allows an ice sheet to form.
  2. The ice sheet insulates fast flowing water from frigid, cold air that can cause frazil ice to form and jam.
  3. Floating ice booms are strung across the river upstream of the dam. The ice booms hold the ice sheet and ice chunks in place to limit travel and ice jamming downstream.

We own and operate one hydro-electric dam, McLeod Dam. The green energy facility started making power in 2008. The original dam was updated with two turbines and generators that harness the renewable energy which is distributed locally. The dam makes enough energy to power 400 homes.

  1. Always exercise caution when boating, hiking or fishing near dams.
  2. Stay off the dam unless the area is clearly marked for public travel.
  3. Be alert to changes in water levels.
  4. Read and pay attention to warning signs near dams.
  5. Check out Quinte Conservation's Spring Water Awareness and Safety Around Dams.
  6. Learn more about how to be safe around dams with help from the Ontario Ministry of Natural Resources and Forestry.

Quinte Conservation conducted a Water Control Structure Condition Assessment, which became the foundation of the Water Infrastructure Capital Asset Plan. The Plan was approved by the Quinte Conservation Executive Board and implemented in September 2021.

The purpose of the assessment is to determine the priority capital projects for the next 10 years. As part of the work, each structure was inspected and recommendations were provided. The recommendations focus on how to properly maintain or upgrade the structure to ensure safe operation, public safety, and longevity.

A major component of the Plan is to complete individual Dam Safety Review’s (DSR) under the current Ministry of Natural Resources and Forestry guidelines (2011). The DSR is a systematic review and evaluation of all aspects of design, construction, maintenance, operation, surveillance, and other factors, processes and systems affecting a dam’s safety. The studies may make recommendations that Quinte Conservation will consider and, if required, add them to the 10-year plan. 

Our Dams

Arthur Holgate Dam

Location: Moira River in the Hamlet of Cannifton, Thurlow Ward, City of Belleville

Year of construction: 1988

Description: Concrete weir with two gates

Purpose: Ice management and recreation

Operation: This dam is not operated

Beaver Meadow Dam

Location: Beaver Meadow Conservation Area, Athol, Prince Edward County

Year of construction: 1982

Description: Small concrete weir with stop logs

Purpose: Recreation, low flow, habitat for waterfowl

Operation: Logs are in place year round. Logs may be removed during high water. Logs are removed for habitat management on a ten year cycle.

Bellrock Main and Mill Dam

Location: Depot Creek at Bellrock, Township of South Frontenac

Year of construction: 1958

Description: The main dam is a small concrete dam with stop logs and an overflow spillway. The mill dam is a small concrete dam with stop logs.

Purpose: The dam was built for the mill operation. Now the dam provides water supply to local residents, and limited recreation.

Operation: This dam is operated when water levels are outside of the operating range.

More information: The mill is not owned by Quinte Conservation

Bloomfield Dam

Location: Bloomfield Mill Pond, Bloomfield, Prince Edward County

Year of construction: 1975

Description: Earth dam with a drop inlet, low flow valve, and channel.

Purpose: Water supply for fire protection, recreation and habitat creation.

Operation: This dam is not operated

Breeze Dam

Location: Salmon River near the Hamlet of Forest Mills, Town of Greater Napanee

Year of construction: 1982 (replacement)

Description: Small concrete dam with stop logs and an overflow spillway.

Purpose: Recreation, low flow, and ice management

Operation: Two logs are removed prior to the winter. The logs are replaced after the snow melt. This dam maintains summer water levels.

Caton's Weir

Location: Downstream of Stoco Lake on the east branch of Lost Channels of the Moira River, upstream of Caton's bridge, Municipality of Tweed

Year of construction: 1968

Description: Concrete dam with wooden panels

Purpose: The dam maintains summer water levels on Stoco Lake.

Operation: The seasonal weir is installed in early summer and removed in late fall.

Chapman's Weir

Location: Downstream of Stoco Lake on the west branch of Lost Channels of the Moira River, downstream of Chapman's bridge, Municipality of Tweed.

Year of construction:

Description: Concrete weir

Purpose: This dam maintains summer water levels on Stoco Lake

Operation: This weir cannot be operated

Colebrook Dam

Location: Napanee River, Hamlet of Colebrook, Township of Stone Mills

Year of construction: 1836

Description: Concrete dam with stop logs and an overflow spillway

Purpose: The dam was built to provide water power for a saw and grist mill. Now the dam provides recreation, such as, swimming, boating, and limited fishing.

Operation: This dam is only operated for maintenance

Consecon Mill Dam

Location: Consecon Creek, Consecon, Prince Edward County

Year of construction: 1975 (replacement)

Description: Concrete dam with stop logs and an overflow spillway

Purpose: The dam was built to replace a historic mill. Now the dam provides water for fire protection and limited recreation.

Operation: Logs are in place year round except during the snow melt.

Dead Creek Dam

Location: Dead Creek, Township of Central Frontenac

Year of construction:

Description: Small concrete dam with stop logs and an overflow spillway

Purpose: Habitat creation

Operation: Logs are in place year round. Logs are removed every 10 years for habitat creation.

Deerock Lake Dam

Location: Outlet of Deerock Lake, flows into Partridge Creek, Addington Highlands

Year of construction: 1969

Description: Earth dam, valve and concrete spillway

Purpose: Recreation, low flow, and habitat

Operation: Water levels are lowered in the fall. Valve is closed after the snow melt. The valve is operated as needed to provide flow to the Skootamatta River in the summer.

Deloro Dam

Location: Moira River, 1.5 kilometres upstream of the Village of Deloro, Municipality of Marmora and Lake

Year of construction: 1953

Description: Concrete dam with two stop log bays

Purpose: The dam was built to provide water to the Deloro Smelting and Mining Company. It is now used to assist with the Deloro Mine clean-up.

Operation: As requested by the Ontario Ministry of the Environment, Conservation, and Parks.

Demorestville Dam

Location: Fish Lake Creek, Demorestville Conservation Area, Demorestville, Prince Edward County

Year of construction: 1978

Description: Concrete dam with two stop log bays

Purpose: Water supply for firefighting, local wells, and recreation

Operation: Logs are removed prior to snow melt. Logs are in place in the summer.

Downey's Weir

Location: Outlet of Moira Lake on Moira River, upstream of Downey's Rapids, Municipality of Tweed

Year of construction: 1964

Description: Concrete dam with wooden panels

Purpose: This dam maintains summer water levels on Moira Lake for recreation.

Operation: The seasonal weir is installed in early summer and removed in late fall.

Flinton Dam

Location: Located at Flinton Conservation Area off of Bridge Water Road in Flinton, Township of Addington Highlands

Year of construction: 1920s

Description: Concrete weir

Purpose: Local water supply, and recreation for cottages, sport fishing, and tourism.

Operation: This dam cannot be operated

George and Lois Wishart Dam

Location: Moira River, 120 metres upstream of Highway 401, Thurlow Ward, City of Belleville

Year of construction: 1990

Description: Concrete weir with two gates

Purpose: Ice management

Operation: This dam is not operated

Hardwood Creek Dam

Location: One kilometre south of the Town of Verona on Hardwood Creek, Central Frontenac Township

Year of construction: 1965

Description: Concrete weir and earth dam

Purpose: Maintains summer water levels on upstream lakes

Operation: This dam is not operated

Harry Mulhall Dam

Location: Moira River downstream of Highway 401, City of Belleville

Year of construction: 1989

Description: Concrete weir with two gates

Purpose: Ice management

Operation: This dam is not operated

Harry Smith Dam

Location: Harry Smith Conservation Area, Village of Ameliasburgh, Prince Edward County

Year of construction: Reconstructed in 2015

Description: Earth dam with valve control

Purpose: Built to power a grist mill. Now the dam provides fire protection, recreation and low flow.

Operation: This dam is operated for low flow for agricultural use.

James Lazier Dam

Location: Salmon River, Village of Lonsdale, Tyendinaga Township

Year of construction: 1981 (reconstruction)

Description: Concrete weir with two stop log bays

Purpose: Built to power a mill. Now the dam provides flood and ice management, recreation, and low flow.

Operation: In early summer, logs are installed in the dam. The south dam can be operated for low flow. There are no high flow operations. In the fall, some logs are removed from the dam. Two stop logs are set above the water level for the ice sheet to form against. These logs are removed before the winter thaw.

Kingsford Weir

Location: Salmon River at Kingsford Conservation Area, approximately 1 kilometer upstream of the Hamlet of Lonsdale, Tyendinaga Township

Year of construction: 1971

Description: Series of wooden panels

Purpose: Recreation

Operation: This dam is not operated anymore. The dam used to be installed in the early summer and removed in the late fall.

Laraby Rapids Dam

Location: 1.2 kilometres downstream of Beaver Lake, Township of Stone Mills

Year of construction: 1975

Description: Concrete weir and two stop log bays

Purpose: Recreation, fisheries, and flow augmentation

Operation: Typically, logs are removed in the fall and replaced in the spring. Logs are removed to let water downstream when flows are low. Logs are removed if water levels get too high.

Lingham Lake Dam

Location: Outlet of Lingham Lake on Black River, Grimsthorpe Township, Municipality of Tweed

Year of construction: 1925

Description: Rock crib dam, stop logs and earth saddle dams

Purpose: Low flow, recreation, and fisheries

Operation: Stop logs are installed after the spring freshet. During the summer months, water levels are lowered to maintain flow in the Black River. Stop logs are removed in the fall.

Lott Dam

Location: Moira River, 400 metres upstream of Pinnacle Street Bridge, City of Belleville

Year of construction: 1979

Description: Concrete weir with two gates

Purpose: Ice management

Operation: This dam is not operated

Lower Arden Dam

Location: Arden Creek, 150 metres downstream of Middle Arden Dam, Hamlet of Arden, Township of Central Frontenac

Year of construction:

Description: Concrete weir and spillway

Purpose: Built to power a mill. Now provides local water supply and limited recreation

Operation: This dam is only operated for maintenance

Macaulay Mountain Dam

Location: Macaulay Creek, Macaulay Conservation Area, Hallowell Ward, Prince Edward County

Year of construction: 1973

Description: Earth dam and outlet culvert

Purpose: Flood management, fire protection, and recreation

Operation: This dam is not operated

McLeod Dam

Location: Moira River, 200 metres upstream of College Street, City of Belleville.

Year of construction: 1979, updated in 2007-2008 for hydro power.

Description: Embankment dam, inflatable weir, and two gates in front of the hydro power turbines.

Purpose: Ice management, hydro power, and recreation.

Operation: This dam is operated to produce hydro power. The operating plan has maximum water levels and minimum downstream flows.

Middle Arden Dam

Location: Between Big Clear Lake and Arden Lake, 45 metres downstream of Upper Arden Dam, Hamlet of Arden, Township of Central Frontenac.

Year of construction:

Description: Stop log dam within the Township Road bridge.

Purpose: Recreation and water supply.

Operation: Two logs are removed prior to the winter. The logs are replaced after the snow melt.

Milford Dam

Location: North of Black River, South Marysburgh Ward, Prince Edward County

Year of construction: 1981

Description: Concrete weir

Purpose: Built for historic mill. Now the dam provides recreation upstream and water supply for fire protection

Operation: This dam is not operated

O'Hara Mill Dam

Location: Deer Creek, O'Hara Mill Pioneer Village and Conservation Area, Madoc Township

Year of construction: Reconstructed in 2010

Description: Concrete dam with stop logs and mill sluice

Purpose: Recreation and historic

Operation: The headpond water levels are maintained within the seasonal operating ranges. This includes removing 2 of the 5 stop logs in the fall and replacing them following the spring freshet. 

Roblin Lake Dam

Location: Outlet of Roblin Lake, off of County Road 19, Ameliasburgh, Prince Edward County

Year of construction: 1988

Description: Concrete weir with stop logs

Purpose: Municipal water supply, recreation, and low flow

Operation: Logs are installed in the spring and removed in the fall to maintain summer water levels

Second Depot Lake Dam

Location: Outlet of Second Depot Lake into Depot Creek, 11 kilometres northwest of Verona, Township of Central Frontenac

Year of construction: 1958

Description: Large earth dam, two stop log bays, and a valve

Purpose: Flood management, low flow, recreation, habitat, and water supply for the Town of Greater Napanee.

Operation: Operated with Third Depot Lake Dam. Water levels are maintained in the operating range, with lower levels in the winter and higher levels in the summer. The dam is operated to provide flow to the Napanee River during low water.

Skootamatta Lake Dam

Location: Outlet of Skootamatta Lake into Skootamatta River, Township of Addington Highlands

Year of construction: 1955

Description: Concrete dam, two stop log bays, an overflow spillway, and two saddle dams

Purpose: Recreation, fisheries, habitat, low flow, and flood management

Operation: Logs are removed in the fall. After the snow melt, logs are replaced. Logs are adjusted in the summer to maintain summer water levels and flow in the Skootamatta River.

Springside Dam

Location: Napanee River, Town of Napanee

Year of construction: 1979

Description: Concrete weir, and stop logs

Purpose: First built in 1786 to power a saw mill. Now provides water supply and recreation.

Operation: This dam is not operated

Third Depot Lake Dam

Location: Outlet of Third Depot Lake into Depot Creek, 16 kilometres northwest of Verona, Township of Central Frontenac

Year of construction: 1975

Description: Large earth dam with two valves

Purpose: Flood management, low flow, and recreation

Operation: Operated with Second Depot Lake Dam. Water levels are maintained in the operating range, with lower levels in the winter and higher levels in the summer. The dam is operated to provide flow to the Napanee River during low water.

Thirteen Island Lake Dam

Location: Outlet of Thirteen Island Lake Dam into Hardwood Creek, Township of South Frontenac

Year of construction: Reconstructed in 2022

Description: Earth dam with three concrete culverts with integral log system

Purpose: Recreation and low flow

Operation: All logs are removed in the fall. After the snow melts, the logs are installed. During high summer water levels, logs may be removed.

Upper Arden Dam

Location: Outlet of Big Clear Lake, upstream of Arden Lake, Hamlet of Arden, Township of Central Frontenac

Year of construction:

Description: Concrete dam with stop logs

Purpose: Water supply, and recreation

Operation: Water levels are lowered in the fall and winter to prepare for the spring snow melt. Logs are placed in the dam after the snow melt. Low flow on the Salmon River is improved by making space between the logs or removing logs. High fall flows may require more logs to be removed.

Varty Lake Dam

Location: 200 metres downstream of the outlet of Varty Lake, Township of Stone Mills

Year of construction: 1972

Description: Concrete dam with stop logs

Purpose: Flood management, recreation, and habitat creation

Operation: Logs are removed in the fall and replaced after the snow melt. More logs may be removed during large snow melts or rainfalls. A gate valve may assist with low flow.

Whitney Memorial Dam

Location: Outlet of Consecon Lake, Consecon, Prince Edward County

Year of construction: 1978

Description: Concrete weir, spillway, three low flow valves, and earth dam

Purpose: Flood management, low flow, recreation and habitat recreation

Operation: This dam is not operated

Woods Dam

Location: Salmon River, southwest edge of the Hamlet of Roblin, Town of Greater Napanee

Year of construction:

Description: Concrete dam and spillway

Purpose: Built to power a mill. Now the dam provides recreation and water supply.

Operation: This dam is not operated

Yardmen Dam

Location: Moira River, upstream of former Lazier Dam site, City of Belleville

Year of construction: 1987

Description: Concrete weir with two gates

Purpose: Ice management

Operation: This dam is not operated